at Hunt
Open full chartThe uppermost gauge on this reach. Flow here is above normal for mid November.
Guadalupe River at Victoria, the farthest downstream of its 17 gauges: 6.5 ft and 764 cfs at 10:15 am EST Wednesday, below normal for mid November. Across the 15 gauges reporting, the river is running above normal.
Readings as of 18 Nov 2026, 11:00 am EST
The uppermost gauge on this reach. Flow here is above normal for mid November.
Flow here is very high for mid November. The river collects another 222 square miles of drainage between Hunt and here.
Flow here is very high for mid November. The river collects another 43 square miles of drainage between Kerrville and here.
Flow here is above normal for mid November. The river collects another 286 square miles of drainage between Center Point and here.
Flow here is running very high for mid November. The river collects another 264 square miles of drainage between Comfort and here.
Flow here is above normal for mid November. The river collects another 212 square miles of drainage between Bergheim and here.
Flow here is below normal for mid November. The river collects another 121 square miles of drainage between Spring Branch and here.
The most recent reading in our records is from 18 Nov 2026, 11:00 am EST.
Flow here is below normal for mid November. The river collects another 439 square miles of drainage between New Braunfels and here.
Flow here is normal for mid November. The river collects another 112 square miles of drainage between Seguin and here.
Flow here is normal for mid November. The river collects another 1,421 square miles of drainage between Gonzales and here.
Flow here is running very high for a typical day of the year. The river collects another 581 square miles of drainage between Gonzales and here.
Flow here is normal for mid November. The river collects another 863 square miles of drainage between Hochheim and here.
Flow here is below normal for mid November.
Flow here is high for a typical day of the year. The river collects another 882 square miles of drainage between Cuero and here.
Flow here is normal for mid November. The river collects another 4,312 square miles of drainage between Bloomington and here.
The lowest gauge on this reach. The river collects another 152 square miles of drainage between Tivoli and here.
State monitoring samples the Guadalupe River at 21 sites, upstream to downstream, measuring pH, phosphorus, conductivity, E. coli, nitrate, turbidity, dissolved oxygen and water temperature. Every current site reads Good (3 of 21 sites; the rest have no recent sample).
The Guadalupe River begins where the North Fork Guadalupe River and the South Fork Guadalupe River meet. It flows into San Antonio Bay. It is 421.4 miles long from its head to its mouth.
Watershed code (HUC-8): 12100201