East Kill
NY · Hudson basin

East Kill

East Kill at Jewett Center: 3 ft and 64.7 cfs at 9:30 am EST Wednesday.

These gauges are reporting as of 18 Nov 2026, 9:30 am EST, but we do not yet hold enough of their long-term record to say whether that is high or low for the date, so no verdict is shown.

1 gauge reporting
36sq mi drains to the lowest gauge
15.9mi long, head to mouth

Water level today

The whole river, head to mouthTap a gauge for its chart.Swipe sideways to see the whole river.
flow gaugewater-quality sitetributary (thickness = size)damyou are here
Camp Harriman Dam

at Jewett Center

Open full chart
35.6 sq mi drains to here +126% vs. 7 days ago

The only gauge on this reach.

About East Kill

East Kill flows into Schoharie Creek 75.7 miles above its mouth, and that water goes on to the Mohawk River. It is 15.9 miles long from its head to its mouth.

Where this comes from

Watershed code (HUC-8): 02020005

Scroll to Top